S.No. | Application No. | Application Date | Purpose | Rejection Date | Rejection Reason |
---|---|---|---|---|---|
1 | WA00003 | 2021-01-18 | Industrial Use | 19/03/2021 | application forwarded to wrd on 12-3-21. |
2 | WA00018 | 2021-03-08 | Industrial Use | 19/03/2021 | Validity of NOC Issued by CGWA has expired on Datd 18.12.2020. (Renewal of NOC for Ground Water use, from CGWA is needed). |
3 | WA00001 | 2021-01-08 | Industrial Use | 26/03/2021 | 0.0 mcm water allocation has been sought, application is not complete |
4 | WA00032 | 2021-04-24 | Industrial Use | 12/05/2021 | Information Given by Applicant is for Surface Water Allotment But Application Form shows Application for Ground Water Allotment |
5 | WA00017 | 2021-03-02 | Industrial Use | 02/06/2021 | (1) Applied Ground Water quantity (63875 KL or CuM perYear) is higher than the quantity (32340 KL or Cum per year), for which NOC issued by the CGWA. (2) Applied Ground Water quantity must be equal or lower than the quantity, mantioned in NOC issued by CGWA. |
6 | WA00045 | 2021-05-31 | Industrial Use | 04/06/2021 | The quantity of water applied is more than the eligibility as per the capacity of the plant, hence the application is rejected. |
7 | WA00029 | 2021-04-07 | Industrial Use | 30/06/2021 | (1) Valid NOC for Ground Water use, from CGWA, New Delhi has Not furnished. (2) Attached Noc from EE, PHE Dn., Bilaspur is not valid |
8 | WA00177 | 2021-07-17 | Industrial Use | 30/07/2021 | Request by usre Agency |
9 | WA00021 | 2021-03-13 | Industrial Use | 02/08/2021 | Request by usea Agency |
10 | WA00034 | 2021-05-04 | Industrial Use | 13/09/2021 | Incompelete Document |
11 | WA00212 | 2021-08-09 | Industrial Use | 20/09/2021 | आपके द्वारा प्रस्तावित 60 KLD डिस्टिलरी संयंत्र के लिए 510 CuM/day भू-जल की मांग की गयी है. ग्राउंड वाटर हेतु CGWA का NOC संलग्न नहीं है. अतः एप्लीकेशन निरस्त किया जाता है. इस संबंध में कार्यालय का पत्र क्रमांक 842, दिनांक 15/09/2021 में वांछित दस्तावेज सहित पुनः आवेदन करें. |
12 | WA00023 | 2021-03-26 | Hydro Electric Power Generation - IPP | 24/09/2021 | निवेशक के प्रतिनिधि द्वारा अवगत कराया गया की त्रुटिवश २ आवेदन प्रस्तुत हो गया है. अतएव यह आवेदन निरस्त किया जाता है. |
13 | WA00230 | 2021-09-28 | Hydro Electric Power Generation - IPP | 29/09/2021 | सतही जल (Surface Water) के स्थान पर भू-जल (Ground Water) के लिए आवेदन प्रस्तुत होने के कारण निरस्त किया गया. |
14 | WA00232 | 2021-09-30 | Hydro Electric Power Generation - IPP | 21/10/2021 | Application revised by investor. |
15 | WA00024 | 2021-03-29 | Hydro Electric Power Generation - IPP | 21/10/2021 | Application revised by investor and resubmit via application No. WA00240 |
16 | WA00245 | 2021-11-02 | Hydro Electric Power Generation - IPP | 02/11/2021 | We have not find a copy of project report file and MoU or copy of agreement executed with Creda. Please submit fresh application along with Location map, Project Report file and MoU. |
17 | WA00027 | 2021-04-07 | Industrial Use | 11/11/2021 | परियोजना हाइड्रो पॉवर से सम्बंधित है, जबकि निवेशक द्वारा जल आबंटन आवेदन औद्योगिक उपयोग हेतु किया गया है. अतः आवेदन निरस्त किया गया. |
18 | WA00208 | 2021-08-05 | Hydro Electric Power Generation - IPP | 11/11/2021 | परियोजना हाइड्रो पॉवर से सम्बंधित है. निवेशक द्वारा आवेदन भूजल हेतु किया गया है. अतः आवेदन निरस्त किया गया. |
19 | WA00025 | 2021-03-30 | Hydro Electric Power Generation - IPP | 11/11/2021 | हाइड्रो पॉवर परियोजना हेतु भूजल आबंटन की मांग की गयी है. अतः आवेदन निरस्त किया गया. |
20 | WA00251 | 2021-11-15 | Industrial Use | 16/11/2021 | Application submitted in wrong section. Please re-submit application for SHEP in Hydro Electric Power section, not in Industrial Use section. |
21 | WA00216 | 2021-08-12 | Industrial Use | 23/11/2021 | Based on Investor demand |
22 | WA00031 | 2021-04-16 | Industrial Use | 27/11/2021 | Validity of NOC Issued by CGWA has expired on Datd 17.11.2021 (Renewal of NOC for Ground Water use, from CGWA is needed). |
23 | WA00037 | 2021-05-15 | Industrial Use | 27/11/2021 | (1) Applied Ground Water quantity (33945 KL or CuM perYear) is higher than the quantity (30690 KL or Cum per year), for which NOC issued by the CGWA. (2) Applied Ground Water quantity must be equal or lower than the quantity, mantioned in NOC issued by CGWA. |
24 | WA00060 | 2021-07-03 | Industrial Use | 27/11/2021 | (1) Applied Ground Water quantity (18250 KL or CuM perYear) is higher than the quantity (16500 KL or Cum per year), for which NOC issued by the CGWA. (2) Applied Ground Water quantity must be equal or lower than the quantity, mantioned in NOC issued by CGWA. |
25 | WA00217 | 2021-08-18 | Industrial Use | 27/11/2021 | (1) Applied Ground Water quantity (74825 KL or CuM perYear) is higher than the quantity (62150 KL or Cum per year), for which NOC issued by the CGWA. (2) Applied Ground Water quantity must be equal or lower than the quantity, mantioned in NOC issued by CGWA. |
26 | WA00239 | 2021-10-12 | Industrial Use | 27/11/2021 | (1) Applied Ground Water quantity (69350 KL or CuM perYear) is higher than the quantity (36500 KL or Cum per year), for which NOC issued by the CGWA. (2) Applied Ground Water quantity must be equal or lower than the quantity, mantioned in NOC issued by CGWA. |
27 | WA00259 | 2021-11-27 | Industrial Use | 30/11/2021 | A location map showing the location of plant and the nearest source of groundwater is not attached. |
28 | WA00028 | 2021-04-07 | Industrial Use | 06/12/2021 | लोकेशन मैप स्वप्रमाणित नहीं है तथा प्रस्तावित संयंत्र स्थल भी चिन्हांकित नहीं है. साथ ही एमओयू की प्रति संलग्न नहीं है. |
29 | WA00257 | 2021-11-20 | Industrial Use | 06/12/2021 | दिनांक 09.11.2020 को निष्पादित MoU में प्रस्तावित परियोजना आपके द्वारा ग्राम झिरिया, जिला बेमेतरा में प्रस्तावित किया गया है जिसके लिए शिवनाथ नदी से जल आबंटन की अनुशंसा १०३/ २८-०१-२०२१ को किया जा चुका है. किरना, रायपुर हेतु कोई mou नहीं है. MoU प्रस्ताव आपके द्वारा वापस लिए जा चुका है. अतः आवेदन निरस्त किया जाता है. |
30 | WA00229 | 2021-09-27 | Industrial Use | 23/12/2021 | Based on Investor Demond |
31 | WA00252 | 2021-11-17 | Hydro Electric Power Generation - IPP | 12/01/2022 | Application revised by investor through WA00285. |
32 | WA00211 | 2021-08-06 | Hydro Electric Power Generation - IPP | 12/01/2022 | Application revised by investor and submitted new application via WA00284. |
33 | WA00279 | 2022-01-03 | Industrial Use | 07/02/2022 | Another online application No. WA00051 for 0.71029 McumM/yr Water allotment from Kurar (Kodar) Nalla/River has already been under process. |
34 | WA00285 | 2022-01-08 | Hydro Electric Power Generation - IPP | 11/02/2022 | क्रेडा की टीप एवं निवेशक द्वारा 15 मेगावाट हेतु नवीन आवेदन WA00289 प्रस्तुत करने के फलस्वरूप निरस्त किया गया. |
35 | WA00293 | 2022-02-09 | Industrial Use | 17/02/2022 | As per Investor Demond |
36 | WA00269 | 2021-12-16 | Industrial Use | 18/02/2022 | As per Investors Demond |
37 | WA00270 | 2021-12-16 | Industrial Use | 18/02/2022 | As per Investors Demond |
38 | WA00030 | 2021-04-08 | Industrial Use | 09/03/2022 | हाइड्रो पॉवर प्रोजेक्ट होने के कारण औद्योगिक प्रयोजन के लिए जल आबंटन के आवेदन निरस्त किया गया. |
39 | WA00011 | 2021-02-25 | Industrial Use | 07/04/2022 | As per investor Demond |
40 | WA00264 | 2021-12-01 | Industrial Use | 07/04/2022 | As per Investor Demond |
41 | WA00260 | 2021-11-28 | Industrial Use | 15/06/2022 | The SIPB has recommended for surface water allotment, BUT online application submitted in wrong format i.e. of Ground Water allotment. |
42 | WA00247 | 2021-11-03 | Industrial Use | 06/07/2022 | Please resubmit A-Note after duly Compliance the Observations/Points raised by T.O. memo No. 3451657/IWA/022/6376, Dated 05.07.2022 |
43 | WA00322 | 2022-05-14 | Any Other | 21/07/2022 | As per Investor Demond |
44 | WA00301 | 2022-03-07 | Industrial Use | 18/08/2022 | As per Investor Demond |
45 | WA00281 | 2022-01-03 | Industrial Use | 26/09/2022 | As per Invester Demond |
46 | WA00290 | 2022-01-31 | Industrial Use | 26/09/2022 | As per Investor Demond |
47 | WA00333 | 2022-06-27 | Industrial Use | 29/09/2022 | Demanded Quantity of Water (0.000365 McuM/Yr) does not match with quantity given in unit wise water requirement calculation sheet (2007 CuM/day or 0.733 McuM/Yr). |
48 | WA00362 | 2022-09-15 | Industrial Use | 10/11/2022 | With reference to required water calculation sheet, per day water requirement is 600 KL (CuM), while in application demanded water is 219 M.Cum/yr and as per SIPB's letter dtd. 19.10.2022, recommended water Quantity is only 219 Cum/yr, thus there is huge mismatch in required, demanded and recommended water quantity. |
49 | WA00287 | 2022-01-20 | Industrial Use | 10/11/2022 | Demanded quantity of Ground Water should not be exceeded against quantity (0.028955) mentioned in NOC of CGWA, New Delhi. While demanded quantity is 0.034675 M.Cum/yr and SIPB's recommended quantity is 0.34675 M.cum/yr. |
50 | WA00033 | 2021-04-28 | Industrial Use | 24/11/2022 | प्रकरण में वार्षिक आधार पर मांग की गई जल मात्रा के तारतम्य में, ग्रीष्मकालीन अवधि में प्रदाय हेतु आवश्यक जल, मुनरेठी एनीकट क्र.-1 में पूर्व निर्धारित जल आरक्षण पश्चात् शेष उपलब्ध नहीं है। अतः यह आवेदन निरस्त किया जाता है। |
51 | WA00247 | 2021-11-03 | Industrial Use | 24/01/2023 | send agenda note with compliance |
52 | WA00247 | 2021-11-03 | Industrial Use | 31/01/2023 | Please send agenda note with compliance |
53 | WA00421 | 2023-01-27 | Industrial Use | 01/03/2023 | As per Investor Demond |
54 | WA00247 | 2021-11-03 | Industrial Use | 06/03/2023 | revert for re- uploading readable water availability proforma,which is illegible, |
55 | WA00247 | 2021-11-03 | Industrial Use | 07/03/2023 | revert for re- uploading readable water availability proforma,which is illegible, |
56 | WA00247 | 2021-11-03 | Industrial Use | 07/03/2023 | Revert for re- uploading readable water availability proforma, which is illegible, |
57 | WA00242 | 2021-10-20 | Industrial Use | 07/03/2023 | In Application, demanded Quantity of Water is 6229.4769 McuM/year, which is too high as compared to 1.71 McuM/year & 1.699 McuM/year given in details of unit wise water requirement sheet and SIPB's recommendation letter respectively. |
58 | WA00046 | 2021-06-04 | Industrial Use | 20/03/2023 | किरना-जलसों जलाशय में, खरीफ सिंचाई एवं निस्तारी हेतु जल आरक्षित करने के उपरान्त संस्थान की मांग अनुसार जल की मात्रा उपलब्ध नहीं है। |
59 | WA00026 | 2021-04-06 | Industrial Use | 20/03/2023 | किरना-जलसों जलाशय में, खरीफ सिंचाई एवं निस्तारी हेतु जल आरक्षित करने के उपरान्त संस्थान की मांग अनुसार जल की मात्रा उपलब्ध नहीं है। |
60 | WA00310 | 2022-04-13 | Industrial Use | 21/03/2023 | please upload NOC of central ground water&SIPB RECOMMENDATION ,index map,and submit off line A-note also. |
61 | WA00310 | 2022-04-13 | Industrial Use | 31/03/2023 | please upload NOC of central ground water&SIPB RECOMMENDATION ,index map,and submit off line A-note also. |
62 | WA00310 | 2022-04-13 | Industrial Use | 06/04/2023 | please upload NOC of central ground water&SIPB RECOMMENDATION ,index map,and submit off line A-note also. |
63 | WA00052 | 2021-06-22 | Industrial Use | 11/04/2023 | वांछित जल के स्रोत खारून नदी/बेन्द्री एनीकट के जल संग्रहण से, पूर्व में औद्योगिक प्रयोजन एवं पेयजल की आपूर्ति हेतु जल आबंटन किया जा चुका है। अतः जल की अनुपलब्धता के कारण जल आबंटन संभव नहीं है। |
64 | WA00247 | 2021-11-03 | Industrial Use | 19/06/2023 | Revert for re- uploading readable water availability proforma, which is illegible, with other docuement. |
65 | WA00247 | 2021-11-03 | Industrial Use | 19/06/2023 | Revert for re- uploading readable water availability proforma, which is illegible, with other document. |
66 | WA00312 | 2022-04-22 | Industrial Use | 26/09/2023 | Desired Quantity of Water is Not in Kharun River |
67 | WA00329 | 2022-06-10 | Industrial Use | 26/09/2023 | Desired Quantity of Water is Not in Kelo River / Kelo Dam |
68 | WA00220 | 2021-09-01 | Industrial Use | 26/09/2023 | संस्थान द्वारा संयंत्र स्थल परिवर्तन के कारण एसआईपीबी के पत्र दिनांक 06.05.2022 के तारतम्य में आवेदन निरस्त किया गया है। |
69 | WA00246 | 2021-11-02 | Industrial Use | 26/09/2023 | Desired Quantity of Water is Not Available in Shivnath River/ Dhamdha Anicut. |
70 | WA00261 | 2021-11-28 | Industrial Use | 12/10/2023 | As requested by Company vide their letter dtd. 26.12.2022 and since, NOC issued by CGWA, New delhi has expired on dtd 15.03.2022, hence cancelled. Now Company may re-apply after getting renewal of NOC from CGWA. |
71 | WA00280 | 2022-01-03 | Industrial Use | 12/10/2023 | As the water demanded by the company is more than the available storage, So allotment of water is not possible from Samoda Barrage in Mahanadi River. |
72 | WA00228 | 2021-09-24 | Industrial Use | 19/10/2023 | As requested by company vide their latter dtd 12.09.2023 through the SIPB' s letter dtd 18.10.2023, this application # WA 00228 has cancelled. |
73 | WA00458 | 2023-07-04 | Industrial Use | 30/01/2024 | As per Investor Demond |
74 | WA00463 | 2023-07-05 | Industrial Use | 30/01/2024 | As Per Investor Demond |
75 | WA00486 | 2023-10-04 | Industrial Use | 05/02/2024 | Proposed nearest source of required surface water is mentioned 'kumhari', which is wrong. |
76 | WA00499 | 2024-01-19 | Industrial Use | 16/04/2024 | AS per Investor Demond |
77 | WA00521 | 2024-07-05 | Any Other | 08/07/2024 | As Per Invester Demond |
78 | WA00520 | 2024-07-04 | Industrial Use | 24/07/2024 | Unit wise quantity does not mention in "Report of detailed assessment of unit wise required quantity of water" |
79 | WA00359 | 2022-08-23 | Industrial Use | 24/07/2024 | संस्थान द्वारा खारुन नदी से आद्योगिक प्रयोजन हेतु जल की मांग की गई है। इस संभाग के कार्यक्षेत्र के अंतर्गत खारुन नदी में विभाग द्वारा क्षमता से अधिक पानी पहले से ही अनुबंधित है। अत: संस्थान को जल प्रदाय करना संभव नहीं है। |
80 | WA00310 | 2022-04-13 | Industrial Use | 25/07/2024 | CGWA नई दिल्ली के पत्र क्र.-NOC No-CGWA/NOC/IND/REN/1/2021/6267, Dtd. 18.07.2021 द्वारा 10 घ.मी. प्रतिदिन (0.0027 मि.घ.मी. वार्षिक) भू-जल आहरण की अनापत्ति प्रदान की गई है। जबकि एजेण्डा-नोट में, CGWA की NOC की तिथि दिनांक 18.07.2022 एवं 07.09.2022 उल्लेखित है, जो गलत है। इसके साथ ही, NOC में उल्लेखित, भू-जल की उक्त मात्रा के स्थान पर 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) उल्लेखित है, जो उचित नहीं है। ऐसा संभवतः, संस्थान द्वारा, अपने ऑनलाईन आवेदन में 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) अंकित किये जाने के कारण हुआ है। अतः संस्थान का आवेदन निरस्त करने निरस्तीकरण प्रस्ताव (Rejection Request) तत्काल प्रेषित करें। |
81 | WA00310 | 2022-04-13 | Industrial Use | 29/07/2024 | CGWA नई दिल्ली के पत्र क्र.-NOC No-CGWA/NOC/IND/REN/1/2021/6267, Dtd. 18.07.2021 द्वारा 10 घ.मी. प्रतिदिन (0.0027 मि.घ.मी. वार्षिक) भू-जल आहरण की अनापत्ति प्रदान की गई है। जबकि एजेण्डा-नोट में, CGWA की NOC की तिथि दिनांक 18.07.2022 एवं 07.09.2022 उल्लेखित है, जो गलत है। इसके साथ ही, NOC में उल्लेखित, भू-जल की उक्त मात्रा के स्थान पर 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) उल्लेखित है, जो उचित नहीं है। ऐसा संभवतः, संस्थान द्वारा, अपने ऑनलाईन आवेदन में 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) अंकित किये जाने के कारण हुआ है। अतः संस्थान का आवेदन निरस्त करने निरस्तीकरण प्रस्ताव (Rejection Request) तत्काल प्रेषित करें। |
82 | WA00310 | 2022-04-13 | Industrial Use | 07/08/2024 | CGWA नई दिल्ली के पत्र क्र.-NOC No-CGWA/NOC/IND/REN/1/2021/6267, Dtd. 18.07.2021 द्वारा 10 घ.मी. प्रतिदिन (0.0027 मि.घ.मी. वार्षिक) भू-जल आहरण की अनापत्ति प्रदान की गई है। जबकि एजेण्डा-नोट में, CGWA की NOC की तिथि दिनांक 18.07.2022 एवं 07.09.2022 उल्लेखित है, जो गलत है। इसके साथ ही, NOC में उल्लेखित, भू-जल की उक्त मात्रा के स्थान पर 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) उल्लेखित है, जो उचित नहीं है। ऐसा संभवतः, संस्थान द्वारा, अपने ऑनलाईन आवेदन में 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) अंकित किये जाने के कारण हुआ है। अतः संस्थान का आवेदन निरस्त करने निरस्तीकरण प्रस्ताव (Rejection Request) तत्काल प्रेषित करें। |
83 | WA00247 | 2021-11-03 | Industrial Use | 12/08/2024 | please attached agenda note file |
84 | WA00310 | 2022-04-13 | Industrial Use | 16/08/2024 | CGWA नई दिल्ली के पत्र क्र.-NOC No-CGWA/NOC/IND/REN/1/2021/6267, Dtd. 18.07.2021 द्वारा 10 घ.मी. प्रतिदिन (0.0027 मि.घ.मी. वार्षिक) भू-जल आहरण की अनापत्ति प्रदान की गई है। जबकि एजेण्डा-नोट में, CGWA की NOC की तिथि दिनांक 18.07.2022 एवं 07.09.2022 उल्लेखित है, जो गलत है। इसके साथ ही, NOC में उल्लेखित, भू-जल की उक्त मात्रा के स्थान पर 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) उल्लेखित है, जो उचित नहीं है। ऐसा संभवतः, संस्थान द्वारा, अपने ऑनलाईन आवेदन में 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) अंकित किये जाने के कारण हुआ है। अतः संस्थान का आवेदन निरस्त करने निरस्तीकरण प्रस्ताव (Rejection Request) तत्काल प्रेषित करें। |
85 | WA00247 | 2021-11-03 | Industrial Use | 05/09/2024 | please attached agenda note file |
86 | WA00200 | 2021-07-28 | Industrial Use | 25/09/2024 | खारून नदी में निर्मित विभागीय जल संग्रहण संरचनाओं में पूर्व आबंटित जल उपयोग पश्चात् नए आवेदकों के उपयोग हेतु जल उपलब्ध नहीं है। अतः इस ऑनलाईन आवेदन क्र.-WA00200 को निरस्त किया जाता है। |
87 | WA00219 | 2021-08-28 | Industrial Use | 25/09/2024 | खारून नदी में निर्मित विभागीय जल संग्रहण संरचनाओं में पूर्व आबंटित जल उपयोग पश्चात् नए आवेदकों के उपयोग हेतु जल उपलब्ध नहीं है। अतः इस ऑनलाईन आवेदन क्र.-WA00219 को निरस्त किया जाता है। |
88 | WA00426 | 2023-02-22 | Industrial Use | 25/09/2024 | महानदी में निर्मित विभागीय समोदा बैराज में, पूर्व आबंटित जल उपयोग पश्चात् नए आवेदकों के उपयोग हेतु जल उपलब्ध नहीं है। अतः इस ऑनलाईन आवेदन क्र.-WA00426 को निरस्त किया जाता है। |
89 | WA00488 | 2023-10-13 | Industrial Use | 21/10/2024 | As Per Investor Demand |
90 | WA00247 | 2021-11-03 | Industrial Use | 25/10/2024 | please sent cancelation request as per sipbs latter dt.10/9/24. |
91 | WA00247 | 2021-11-03 | Industrial Use | 25/10/2024 | please sent cancelation request as per sipbs latter dt.10/9/24. |
92 | WA00434 | 2023-03-15 | Industrial Use | 29/10/2024 | ‘‘जिस स्रोत/योजना-महानदी में निर्मित समोदा बैराज से पाईप लाईन द्वारा कुम्हारी जलाशय की जल-संग्रहण क्षमता में वृद्धि की येाजना वर्तमान में प्रगतिरत होने से जल की उपलब्धता सुनिश्चित नहीं है। अतः वांछित जल आबंटन प्रदान करना वर्तमान में संभव नहीं है।‘‘ |
93 | WA00455 | 2023-06-28 | Industrial Use | 29/10/2024 | ‘‘जिस स्रोत/योजना-महानदी में निर्मित समोदा बैराज से पाईप लाईन द्वारा कुम्हारी जलाशय की जल-संग्रहण क्षमता में वृद्धि की येाजना वर्तमान में प्रगतिरत होने से जल की उपलब्धता सुनिश्चित नहीं है। अतः वांछित जल आबंटन प्रदान करना वर्तमान में संभव नहीं है।‘‘ |
94 | WA00504 | 2024-04-24 | Industrial Use | 29/10/2024 | ‘‘जिस स्रोत/योजना-महानदी में निर्मित समोदा बैराज से पाईप लाईन द्वारा कुम्हारी जलाशय की जल-संग्रहण क्षमता में वृद्धि की येाजना वर्तमान में प्रगतिरत होने से जल की उपलब्धता सुनिश्चित नहीं है। अतः वांछित जल आबंटन प्रदान करना वर्तमान में संभव नहीं है।‘‘ |
95 | WA00015 | 2021-02-25 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
96 | WA00171 | 2021-07-16 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
97 | WA00226 | 2021-09-22 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
98 | WA00262 | 2021-11-29 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
99 | WA00360 | 2022-08-26 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
100 | WA00412 | 2022-12-05 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
101 | WA00473 | 2023-08-08 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
102 | WA00475 | 2023-08-11 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
103 | WA00487 | 2023-10-13 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
104 | WA00498 | 2024-01-16 | Industrial Use | 29/10/2024 | ‘‘वांछित जल के स्रोत पर शेष उपलब्ध जल की मात्रा शून्य होने के कारण जल आबंटन/प्रदाय करना संभव नहीं है।‘‘ |
105 | WA00247 | 2021-11-03 | Industrial Use | 20/11/2024 | As recommended by EE, WR division, Bemetara vide their letter dtd. 25.10.2024 |
106 | WA00056 | 2021-07-01 | Industrial Use | 20/11/2024 | जल संसाधन संभाग बेमेतरा के अंतर्गत किसी भी जल संग्रहण संरचना में वांछित जल मात्रा उपलब्ध न होने के कारण निरस्त। |
107 | WA00310 | 2022-04-13 | Industrial Use | 22/11/2024 | CGWA नई दिल्ली के पत्र क्र.-NOC No-CGWA/NOC/IND/REN/1/2021/6267, Dtd. 18.07.2021 द्वारा 10 घ.मी. प्रतिदिन (0.0027 मि.घ.मी. वार्षिक) भू-जल आहरण की अनापत्ति प्रदान की गई है। जबकि एजेण्डा-नोट में, CGWA की NOC की तिथि दिनांक 18.07.2022 एवं 07.09.2022 उल्लेखित है, जो गलत है। इसके साथ ही, NOC में उल्लेखित, भू-जल की उक्त मात्रा के स्थान पर 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) उल्लेखित है, जो उचित नहीं है। ऐसा संभवतः, संस्थान द्वारा, अपने ऑनलाईन आवेदन में 27000 घ.मी. प्रतिदिन (9.855 मि.घ.मी. वार्षिक) अंकित किये जाने के कारण हुआ है। अतः संस्थान का आवेदन निरस्त किया जाता है। |
108 | WA00519 | 2024-07-03 | Industrial Use | 09/01/2025 | ‘‘राबो बांध से पूर्व निर्धारित जल उपयोग के पश्चात् शेष जल की अनुपलब्धता के कारण, वांछित जल का आबंटन/प्रदाय किया जाना संभव नहीं है‘‘ |
109 | WA00361 | 2022-09-01 | Industrial Use | 15/01/2025 | As Per Investor Demond |